# Post-Renovation Deep Cleaning Service

> การทำความสะอาดแบบล้ำลึกหลังการปรับปรุงสิ่งปลูกสร้าง

Price: 2500.00 THB
HTML page: https://khunclean.com/th/bangkok/after-renovation-cleaning
JSON: https://khunclean.com/th/bangkok/after-renovation-cleaning.json

The Post-Renovation Cleaning Checklist

Renovation dust is not regular dust. It contains fine particles from cutting, sanding, drilling, and grinding materials like concrete, plaster, wood, and tile. These particles are smaller than household dust, penetrate deeper into surfaces, and pose genuine respiratory risks if not properly removed. A standard cleaning will not address this type of contamination. Here is the systematic approach used for post-renovation deep cleaning.

Phase 1: Bulk Debris Removal

Sweep and collect all visible debris: offcuts, packaging, screws, tape

Remove any protective film or paper left by contractors

Clear windowsills, countertops, and ledges of construction materials

Bag and remove all waste from the property

Phase 2: Dry Dust Removal

HEPA-filtered vacuum all floors, working from far corners toward the exit

Vacuum all horizontal surfaces: shelves, cabinet tops, window frames

Vacuum inside all cabinets and drawers (construction dust migrates everywhere)

Dust ceiling corners, light fixtures, and fan blades with microfiber tools

Vacuum AC vent covers and accessible filter surfaces

Dust all vertical surfaces: door frames, window frames, baseboards

Phase 3: Adhesive and Paint Removal

Scrape dried paint drips from floors, windowsills, and fixtures using plastic scrapers (non-damaging)

Remove adhesive residue from sticker labels, tape, and protective film

Clean grout haze from newly tiled surfaces (the cloudy film left by grouting)

Remove silicone smears from around sinks, bathtubs, and window frames

Phase 4: Wet Cleaning

Mop all floors with appropriate cleaner for the floor material

Wipe all walls where construction dust has settled visibly

Clean all windows inside and out, including frames and tracks

Clean and disinfect all bathroom fixtures: toilet, sink, shower, bathtub

Clean and degrease all kitchen surfaces: countertops, sink, stove, cabinet fronts

Wipe all doors, handles, and switch plates

Phase 5: Detail and Inspection

Polish all glass and mirror surfaces streak-free

Check and clean inside all closets and storage spaces

Clean balcony if used for construction access or material storage

Final floor mop to catch any dust that settled during the cleaning process

Walkthrough to verify every area meets standards

Why Two Passes Are Sometimes Needed

Fine construction dust has a property that makes it particularly frustrating: it becomes airborne during cleaning and resettles after the cleaning team leaves. This is normal. For heavily renovated spaces (full gut renovations, extensive sanding, or drywall work), a second light cleaning pass 24 to 48 hours after the initial deep clean catches the dust that resettled. This second pass is much faster than the first because the bulk of contamination was already removed.

Timing

Schedule the deep clean after all construction, painting, and finishing work is 100% complete. Paint and silicone should be fully cured (at least 24 hours). If furniture delivery is planned, clean the empty space first. It is far easier and more thorough than cleaning around furniture.